Rough‑In Must‑Haves
- Electrical: drops labeled; correct phase/amps; dedicated circuits.
- Plumbing: floor sinks/trench drains exact; hot/cold with shutoffs.
- Gas: pipe sizing matches connected load; valves accessible.
- Ventilation: hood & duct penetrations coordinated with structure.
- Clearances: equipment service space + ADA maintained.
- Coordination: MEP drawings match latest equipment schedule.
Print the PDF and tape it in the trailer. It saves arguments—trust me.
Download the checklist (PDF)